How to make the foundation of container houses stable?
Apr 14, 2024
Leave a message
1. Firstly, conduct a hardness test. For special terrains or foundations with significant differences in hardness, special treatment should be carried out to ensure the smooth installation and quality of residential containers. Technicians should take measurements before doing their job well.
2. After the basic measurement, the next step is to pour the foundation. At this point, the liquid level must be measured first. After pouring is completed, the error of the level should be controlled within 10mm. It should be noted that after explaining and completing the foundation to the other party, it is necessary to require them to ensure that the foundation level is within the error range to avoid affecting the subsequent operation process.
Generally speaking, the foundation is C20 and there are no steel bars inside. Of course, in special terrains or other uncontrollable conditions, the plan should be determined based on the determination of technical personnel.
3. Similar to traditional concrete pouring techniques, the construction of residential containers cannot reduce the process flow. After the foundation pouring is completed or before installing the mobile house, sufficient time should be left to ensure that the concrete meets the hardness requirements.
4. It must be poured together with the indoor floor, at the same level as the foundation, to ensure the construction period, quality, and aesthetics of the equipment. After the installation of the activity room, the floor is laid indoors for convenience and tidiness, without affecting the appearance and quality.